Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Home ProductsPolyurethane Foam Machine

Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter

Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter

    • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
    • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
    • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
    • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
    • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
    • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
  • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter

    Product Details:

    Place of Origin: Guangdong China (Mainland)
    Brand Name: ZHMACH
    Certification: CE Certificate
    Model Number: ZFP-2017

    Payment & Shipping Terms:

    Minimum Order Quantity: one set
    Price: inquiry
    Packaging Details: Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ.
    Delivery Time: 45 days
    Supply Ability: One set per month
    Contact Now
    Detailed Product Description
    Product Type: Flexible Foam Making Machine Automatic: Yes
    Voltage: 380V Power(W): 130KW
    Weight: 20 Tons Dimension(L*W*H): 3400*4550*4200mm
    After-sales Service Provided: Engineers Available To Service Machinery Overseas Flow: Glass Flow Meter Check Flow
    Foaming Mode: Horizontal Foaming Foam Type: Spray And Trough
    Control: Automatic PLC With Touch Screen Foaming Width: 980mm~2350mm
    Foaming Height: Max 1300mm Foaming Density: 8Kg/m3~100kg/m3
    Inverter: Siemens/ Delta /Danfoss System: R.S Pulling System With Plastic

     

    Automatic Memory Polyurethane sponge with Siemens inverter foam sheets production line

     

     

    Product Description

     

    [Specifications]

     

    Dimension L35M×W4M×H3M
    Foaming width 980mm~2250mm
    Foaming height Under 1200mm
    Foaming density 8kg/m3~100kg/m3
    Foaming speed 2000rpm~7000rpm

     

    (1)The whole machine parts specifications:

     

    1. Foaming control Platform(standard) L3m×W2.52m×H0.7m

    2. Oven declining board (standard) L9m×W0.98m~2.30m

    3. Oven side links(standard) L18m×W2.3m×H1.2m

    4. Oven machine frame(standard) L18m ×W4m×H3m

    5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m

    6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )

     

    (2)Main technique specification

     

    1. Total length 35m× width 4m×height 3m

    2. Foaming material Group: 13 groups, man-machine interface, automatically computer control

    3. Foaming width 980mm~2250mm

    4. Foaming height Max 1300mm

    5. Foaming density 8Kg/m³~100Kg/m³

    6. Foaming speed 2000r/min~7000r/min

    7. Max total output 300KG/min

     

    Motor Guangdong brand
    Pump Viking pump & Chinese pump
    Invertor Siemens brand
    PLC Siemens
    Temperature Control system

     

    Max Output Capacity 200~350kg/min(Continuous Type) Side Wall Size L18m*H1220m
    Mixer Total Power 37kw Fallplate L7m*W1.3~2.3m(Adjustable)
    Max Mixing Speed 200~7000r/min Foaming Platform L2000mm*W3000mm*H700mm
    Foaming Type Trough & Sprayer Conveyor Line L18.1m
    Save Formular Q.T.Y. 13 groups Side/Bottom Paper Feed & Rewind System 2sets
    Foaming Size W2300mm*H1300mm(Width Adjustable) Walkway W500mm*L12m
    Control System PLC Digital Touch Screen and Electric Control System Air valves Euro Standard
    PPG Tank 5ton*1set Chiller(both cooling&Heating system) 1set*15kw(20HP)
    POP Tank 5ton*1set Side film lifting system 1set
    PPG+CACO3 Tank 5ton*1set Foaming Density Range 6-100kg/Cubicmeter
    Fire-Retardard Tank 2ton*1set Match with block cutter 1set
    TDI Tank 5ton*1set Total Motor power Approx 120kw
    MC Tank 2ton*1set Air compressor Match with 7.5kw(10HP)*1set
    Silicone+Water Tanks 180L*2sets Machine N.W. Approx *25ton
    T-9+Amine+Color(A.B.C) 180L*5sets Floor Space Required L45m*W5m*H4.5m

     

    Remark:The above only for reference. All the data is subjected to sold products.

     

    The frame of production line 

     

    Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
     
    The foam oven
     
    Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
     
    Foaming control platform
     
    Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
     
    Mixing head and material tanks
     
    Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
     
    Packing & shiping
     

    How is the packing of the machine?

     

    The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

     

    How many container will be needed for the whole set of machine?

     

    Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

     

    We will try the best way to pack all the machine well and also save the freight cost.

     

    Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter

     

    Our Services

     

    We will help to design the layout of the machine that put in your factory.

    We will send 2-4 experience engineers to install and testing the machines.

    We will teach your engineer how to operate the machine and how to maintain the machines.

    We will give you the machine operation manual and the best formulation for target products that you are going to make.

     

    Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter

     

    FAQ

     

    Q: How many days for the install and testing of the machine?

     

    A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

     

    Q: For the cost of the engineer how much I need to pay?

     

    A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

     

    Q:What kind of raw material tools we need to prepare for the testing?

     

    A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

     

    Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

     

    A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

     

    Q:During the foaming if we have some problems abt the foam and the machine how can we do?

     

    A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

     

     
     

    You are warmly welcome come and visit our factory.

     

    INSTRUCTION OF CONTINUOUS FAOMING MACHINE LINE.pdf

    Contact Details
    Dongguan Zehui machinery equipment co., ltd

    Contact Person: Mr wang

    Send your inquiry directly to us (0 / 3000)

    Other Products