logo
Send Message
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Home ProductsPolyurethane Foam Machine

Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter

Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter

  • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
  • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
  • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
  • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
  • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
  • Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter
Product Details:
Place of Origin: Guangdong China (Mainland)
Brand Name: ZHMACH
Certification: CE Certificate
Model Number: ZFP-2017
Payment & Shipping Terms:
Minimum Order Quantity: one set
Price: inquiry
Packaging Details: Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ.
Delivery Time: 45 days
Supply Ability: One set per month
Contact Now
Detailed Product Description
Product Type: Flexible Foam Making Machine Automatic: Yes
Voltage: 380V Power(W): 130KW
Weight: 20 Tons Dimension(L*W*H): 3400*4550*4200mm
After-sales Service Provided: Engineers Available To Service Machinery Overseas Flow: Glass Flow Meter Check Flow
Foaming Mode: Horizontal Foaming Foam Type: Spray And Trough
Control: Automatic PLC With Touch Screen Foaming Width: 980mm~2350mm
Foaming Height: Max 1300mm Foaming Density: 8Kg/m3~100kg/m3
Inverter: Siemens/ Delta /Danfoss System: R.S Pulling System With Plastic
Highlight:

polyurethane foam equipment

,

continuous foaming machine

,

polyurethane sponge making line

 

Automatic Memory Polyurethane sponge with Siemens inverter foam sheets production line

 

 

Product Description

 

[Specifications]

 

Dimension L35M×W4M×H3M
Foaming width 980mm~2250mm
Foaming height Under 1200mm
Foaming density 8kg/m3~100kg/m3
Foaming speed 2000rpm~7000rpm

 

(1)The whole machine parts specifications:

 

1. Foaming control Platform(standard) L3m×W2.52m×H0.7m

2. Oven declining board (standard) L9m×W0.98m~2.30m

3. Oven side links(standard) L18m×W2.3m×H1.2m

4. Oven machine frame(standard) L18m ×W4m×H3m

5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m

6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )

 

(2)Main technique specification

 

1. Total length 35m× width 4m×height 3m

2. Foaming material Group: 13 groups, man-machine interface, automatically computer control

3. Foaming width 980mm~2250mm

4. Foaming height Max 1300mm

5. Foaming density 8Kg/m³~100Kg/m³

6. Foaming speed 2000r/min~7000r/min

7. Max total output 300KG/min

 

Motor Guangdong brand
Pump Viking pump & Chinese pump
Invertor Siemens brand
PLC Siemens
Temperature Control system

 

Max Output Capacity 200~350kg/min(Continuous Type) Side Wall Size L18m*H1220m
Mixer Total Power 37kw Fallplate L7m*W1.3~2.3m(Adjustable)
Max Mixing Speed 200~7000r/min Foaming Platform L2000mm*W3000mm*H700mm
Foaming Type Trough & Sprayer Conveyor Line L18.1m
Save Formular Q.T.Y. 13 groups Side/Bottom Paper Feed & Rewind System 2sets
Foaming Size W2300mm*H1300mm(Width Adjustable) Walkway W500mm*L12m
Control System PLC Digital Touch Screen and Electric Control System Air valves Euro Standard
PPG Tank 5ton*1set Chiller(both cooling&Heating system) 1set*15kw(20HP)
POP Tank 5ton*1set Side film lifting system 1set
PPG+CACO3 Tank 5ton*1set Foaming Density Range 6-100kg/Cubicmeter
Fire-Retardard Tank 2ton*1set Match with block cutter 1set
TDI Tank 5ton*1set Total Motor power Approx 120kw
MC Tank 2ton*1set Air compressor Match with 7.5kw(10HP)*1set
Silicone+Water Tanks 180L*2sets Machine N.W. Approx *25ton
T-9+Amine+Color(A.B.C) 180L*5sets Floor Space Required L45m*W5m*H4.5m

 

Remark:The above only for reference. All the data is subjected to sold products.

 

The frame of production line 

 

Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter 0
 
The foam oven
 
Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter 1
 
Foaming control platform
 
Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter 2
 
Mixing head and material tanks
 
Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter 3
 
Packing & shiping
 

How is the packing of the machine?

 

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

 

How many container will be needed for the whole set of machine?

 

Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

 

We will try the best way to pack all the machine well and also save the freight cost.

 

Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter 4

 

Our Services

 

We will help to design the layout of the machine that put in your factory.

We will send 2-4 experience engineers to install and testing the machines.

We will teach your engineer how to operate the machine and how to maintain the machines.

We will give you the machine operation manual and the best formulation for target products that you are going to make.

 

Automatic Polyurethane Sponge Making Machine Line With Siemens Inverter 5

 

FAQ

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

 
 

You are warmly welcome come and visit our factory.

 

INSTRUCTION OF CONTINUOUS FAOMING MACHINE LINE.pdf

Contact Details
Dongguan Zehui machinery equipment co., ltd

Contact Person: Wang

Tel: 0086-15817646348

Fax: 86-0769-88875397

Send your inquiry directly to us (0 / 3000)

Other Products