logo
Send Message
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Home ProductsFoam Making Machine

Full Automatic Mattress Manufacturing Machines , Industrial Foam Machine For Sofa / Shoes

Full Automatic Mattress Manufacturing Machines , Industrial Foam Machine For Sofa / Shoes

  • Full Automatic Mattress Manufacturing Machines  , Industrial Foam Machine For Sofa / Shoes
  • Full Automatic Mattress Manufacturing Machines  , Industrial Foam Machine For Sofa / Shoes
Full Automatic Mattress Manufacturing Machines  , Industrial Foam Machine For Sofa / Shoes
Product Details:
Place of Origin: Guangdong, China (Mainland)
Brand Name: ZHMACH
Certification: CE
Model Number: ZHF-2017
Payment & Shipping Terms:
Minimum Order Quantity: one set
Price: inquiry
Packaging Details: foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ
Delivery Time: 45days after receive downpayment
Payment Terms: Western Union, L/C, T/T
Supply Ability: two sets per month
Contact Now
Detailed Product Description
Product Type: Automatic Continously Foam Making Machine Weight: 25tons
Voltage: 380V Machine Pump: U.S VIKING PUMP/ JAPANESE
Foam Type: Overflow Box And Spray Head RS Pulling System: R.S.pulling System With The Plastic Film
Fall Plate: 7 Section Automatic Adjustale Foaming Speed: 2000r/min-7000r/min
Conveyer: For Long Sheet Foam 50m Conveyer Foaming Way: Spray Head And Overflow Box
Block Cutter: Blade & Saw Tooth Double Knife Type/ Blade Type/Saw Tooth Type
Highlight:

foam production machine

,

foam making equipment

,

polyurethane foam manufacturing machines

 

Full Automatic Mattress Manufacturing Machines , Industrial Foam Machine For Sofa / Shoes

 

The ZHF-2017 Horizontal Continuously foam production line is an automatic continous foaming machine for producing flexible polyurethane foam used in furniture,shoe material,packing,electron,garment and transportation industrial.it's the ideal production equipment for large-scale foaming.

 

We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.

 

Description:

 

This machine is mostly used for producing of soft urethane foam rubber productions

(density is about 10-50kg/m³).

It’s automaton-action level is high.the production is low low cost and the operation is

simple.It is desirable equipment to manufacture products of foam rubber in furniture,

shoes,circumference,electron clothing andautomobile industry.

 

Main specification

 

 Oven Length 18m
 Foam Height 1.0-1.25m
 Foam Width 1.0-2.25m
 foam desity 8-200kg/m³
 total power 130KW
 inner coveyer length 18m
 side board adjustable width 0.98-2.3m
 conveyer belt speed 0-8m/min
 fall plate seven section adjustable
 total output 100-300kg/min
 machine dimension L35× W4.2 ×H3.2m
 
 

Main technique specification:

 

Dimension Total length 35m×Total width 4m×Total Height 3m
Foaming material Group 13 groups, man-machine interface, both manual and automatically computer control
Foaming width 980mm~2250mm
Foaming height Max 1200mm
Foaming density 8Kg/m³~100kg/m³
Foaming speed 2000r/min~7000r/min
Max total output 300kg/min
Material spraying way ① The way of down sprayer head (upper, down, front, back can be adjusted)             ② the way of trough overflow pipe.
Controlling way of foaming

①PLC controlling, can continuously foaming two different formulas in one time

②All inverter controlling foaming and work in phase with the production line

③Oven declining board height and width can be adjusted by control box.

④Oven side links width can be adjusted by control box

Mixing –head motor

37kw

Total power

About 90kw
 
 
Type Use Specification Qty
Big material tank PPG 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system 1
Big material tank POP 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

1

 

Big material tank CaCo3 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system 1
Big material tank TDI 5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1

 

Big material tank Flame retardant 2m³/δ3m stainless steel, with filter system 1
Big material tank MC 2m³/δ2mm stainless steel, with filter system 1
Small material tank Si 180L/δ1mm stainless steel 1
Small material tank A-33 180L/δ1mm stainless steel, with filter system 1
Small material tank T9 180L/δ1mm stainless steel, with filter system 1
Small material tank H2O 180L/δ1mm stainless steel 1
Small material tank Color 180L/δ1mm stainless 1
Small material tank Anti-yellow 180L/δ1mm stainless steel 1
Small material tank Black 180L/δ1mm stainless steel 1
Floor powder mixing tank PPG, POP, Powder 1.5m³/δ3mmA3 steel plate, with filter system 1
Filter tank POP, Powder 1.5m³/δ4mmA3 steel plate 1

 

 

 

FAQ:

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

 

 

The main part of the machine

 

Full Automatic Mattress Manufacturing Machines  , Industrial Foam Machine For Sofa / Shoes 0

 

 

 

Full Automatic Mattress Manufacturing Machines  , Industrial Foam Machine For Sofa / Shoes 1

Full Automatic Mattress Manufacturing Machines  , Industrial Foam Machine For Sofa / Shoes 2

Contact Details
Dongguan Zehui machinery equipment co., ltd

Contact Person: Wang

Tel: 0086-15817646348

Fax: 86-0769-88875397

Send your inquiry directly to us (0 / 3000)

Other Products