logo
Send Message
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Home ProductsSponge Production Line

Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter

Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter

Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter
video
Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter
Product Details:
Place of Origin: Guangdong China (Mainland)
Brand Name: ZHMACH
Certification: CE Certificate
Model Number: ZFP-2017
Payment & Shipping Terms:
Minimum Order Quantity: one set
Price: inquiry
Packaging Details: Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ.
Delivery Time: 45 days
Supply Ability: One set per month
Contact Now
Detailed Product Description
Product Type: Flexible Foam Making Machine Dimension(L*W*H): 3400*4550*4200mm
After-sales Service Provided: Engineers Available To Service Machinery Overseas Flow: Glass Flow Meter Check Flow
Foam Type: Spray And Trough Control: Automatic PLC With Touch Screen
Foaming Width: 980mm~2350mm Foaming Density: 8Kg/m3~100kg/m3
Inverter: Siemens/ Delta /Danfoss System: R.S Pulling System With Plastic
Highlight:

foam mattress production line

,

sponge making machine

,

Memory Polyurethane Sponge Production Line

 

Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter

 

[Specifications]

 

Dimension L33M×W4M×H3M
Foaming width 980mm~2250mm
Foaming height Under 1200mm
Foaming density 8kg/m3~100kg/m3
Foaming speed 2000rpm~7000rpm

 

 

(1) The whole machine parts specifications:

 

1. Foaming control Platform(standard) L3m×W2.52m×H0.7m

2. Oven declining board (standard) L9m×W0.98m~2.30m

3. Oven side links(standard) L18m×W2.3m×H1.2m

4. Oven machine frame(standard) L18m ×W4m×H3m

5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m

6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )

 

 

Motor Guangdong brand
Pump Viking pump & Chinese pump
Invertor Siemens brand
PLC Siemens
Temperature Control system

 

 

Gear pump types:

 

Model Specification

Use material

 

Qty/set Brand
K124A 200L/min

PPG

 

1 Viking Pump
K124A 200L/min

POP

 

1 Viking Pump
L32 300L/min

CaCo3

 

1 Viking Pump
NB-80 120L/min

TDI

 

1 Shanghai
NB-32 30L/min

MC

 

1 Shanghai
NB-25 25L/min

Flame retardant

 

1 Shanghai
GPY-6 6L/min

Si

 

1 Japan
GPY-5.8 6L/min

A-33

 

1 Japan
GPY-5.8 6L/min

T9

 

1 Japan
GPY-11.5 8 L/min

H2O

 

1 Japan
GPY-12 8 L/min

Colour1

 

1 Japan
GPY-12 8 L/min

Anti-yellow

 

1 Japan
GPY-12 8 L/min

Black color

 

1 Japan

 

Remark:The above only for reference. All the data is subjected to sold products.

 

 
Packing & shiping
 

How is the packing of the machine?

 

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

 

How many container will be needed for the whole set of machine?

 

Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

 

We will try the best way to pack all the machine well and also save the freight cost.

 

 

 

Our Services

 

We will help to design the layout of the machine that put in your factory.

We will send 2-4 experience engineers to install and testing the machines.

We will teach your engineer how to operate the machine and how to maintain the machines.

We will give you the machine operation manual and the best formulation for target products that you are going to make.

 

 

 

FAQ

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter 0
 

You are warmly welcome come and visit our factory.

Contact Details
Dongguan Zehui machinery equipment co., ltd

Contact Person: Wang

Tel: 0086-15817646348

Fax: 86-0769-88875397

Send your inquiry directly to us (0 / 3000)

Other Products