Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China | zhmach@zehuimach.com |
Place of Origin: | China mainland |
Brand Name: | ZHMACH |
Certification: | CE |
Model Number: | ZHF-2018 |
Minimum Order Quantity: | one set |
---|---|
Price: | US $135,000-152,000 / Sets |
Packaging Details: | Continuously Automatic Horizontal Mattress Sponge Foam Making Machine Line will be naked packing, and some parts in wooden case. Totally need 2*40HQ container and 1*20GP contrainer |
Delivery Time: | 50-60 days |
Payment Terms: | L/C, T/T |
Supply Ability: | 2 Set/Sets per Quarter |
Processing Type: | Foaming Machine | After-sales Service Provided: | Engineers Available To Service Machine Overseas |
---|---|---|---|
Dimension(L*W*H): | L33m*W4.5m*H3.2m | Motor/Invetor: | Siemens/ Donggguan Motor And Delt |
Foam Top Control System: | R.S. Pulling System | Raw Material: | Polyurethane |
Flow Meter: | Glass Flow Meter | Foaming Way: | Overflow Box And Spray Head |
Machine Control Way: | Automatic PLC And Invertor Control | Pump: | U.S. VIKING / Shanghai/Japan |
High Light: | foam manufacturing machine,foam making equipment,mattress sponge foam making machine |
Mattress Sponge Foam Making Machine , Low Noise Foam Manufacturing Equipment
Foam Sponge Making Machine Line is the automatic horizontal continously foaming machine that make the furniture foam like sofa and mattress. The standard machine was together with 13 kinds of raw material.
For the process of foaming
Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process
Max.Output Capacity | 200~350kg/min(Continuous Type) |
Mixer Total Power | 37kw |
Max.Mixing Speed | 2500~6000r/min |
Foaming Type | Trough & Sprayer |
Standard Material Q.T.Y. | 13 Groups. |
Foaming Size | W2300mm*H1300mm(Width Adjustable) |
Control System | PLC Digital Touch Screen |
PPG Tank | 5Ton*1Set. |
POP Tank | 5Ton*1Set. |
TDI Tank | 5Ton*1Set. |
MC Tank | 2Ton*1Set. |
Caco3 Tanks | 5Ton*1Set |
T-9/Amine/Color 1ABCD/ Silicone /Water Tanks | 180L*8Sets |
Side Wall Size | L16m*H1200mm |
Fall plate | L8.5m*W0.98~2.4m(Adjustable) |
Foaming Platform | L2000mm*W3000mm*H700mm |
Conveyor Line | L16.9m |
Side/Bottom Paper Feed & Rewind System | 2Sets. |
Walkway | W500mm*L15m |
Air Valves | U.S. Standard |
Chiller(Both Cooling & Heating System) | 1Set*1.5HP |
R.S.Pulling System | 1Set. |
Foaming Density Range | 8~150kg/Cubicmeter. |
Match With Block Cutter | 1Set. |
Total Motor Power | Approx 125kw. |
Machine N.W. | Approx 30 Ton |
Floor Space Required | L45m*W5m*H4.5m. |
1. The Foam machine sponge making machine nacked packing and some spares parts we will pack in the wooden case also in order to save the place we will also put some parts into the material tanks.
2.Then we can save the cost of shippment and for one 13groups machine we need 2*40HQ+1*20GP three containers only
1.We will help to design the layout of the machine that put in your factory.We will send 2-4 experience engineers to install and testing the machines.
2.We will teach your engineer how to operate the machine and how to maintain the machines.
3.We will give you the machine operation manual and the best formulation for target products that you are going to make.
4.We will help to buy the best raw material for making the foam if you needed.
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do ?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
Contact Person: Wang
Tel: 0086-15817646348
Fax: 86-0769-88875397
130KW PE Foam Net Making Machine , EPE Bags Foam Manufacturing Equipment
EPE Foam Making Machine , Low Pressure Polyurethane Foam Machine With Siemens Invertor
Full Automatic Mattress Manufacturing Machines , Industrial Foam Machine For Sofa / Shoes
High Speed Vertical Foam Making Machine With Electronic Frequency Converter Control
Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter
Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture
Vertical Foam Mattress Making Machine Manual Operation With Speed 30~40 R/Min
Auto Sponge Circle Horizontal Foam Cutting Machine / CNC Foam Cutter Machine
Industrial Vertical Foam Cutter For Sponge Mattress , Cnc Eps Cutting Machine
Rail Type Foam Block Foam Sheet Cutting Machine Horizontal PLC Control
Hydraulic Polyurethane Foam Cutting Machine For Sponge Sheet Automatic Control