Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Home ProductsFoam Making Machine

Automatic Horizontal Pu Foam Manufacturing Machines For Mattress Pillow

Automatic Horizontal Pu Foam Manufacturing Machines For Mattress Pillow

  • Automatic Horizontal Pu Foam Manufacturing Machines For Mattress Pillow
Automatic Horizontal Pu Foam Manufacturing Machines For Mattress Pillow
Product Details:
Place of Origin: Guangdong, China (Mainland)
Brand Name: ZHMACH
Certification: CE
Model Number: ZHF-2017
Payment & Shipping Terms:
Minimum Order Quantity: one set
Price: inquiry
Packaging Details: foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ
Delivery Time: 45 workdays after receive down payment
Payment Terms: Western Union, L/C, T/T
Supply Ability: two sets per month
Contact Now
Detailed Product Description
Product Type: Automatic Continously Foam Making Machine Machine Pump: U.S VIKING PUMP/ JAPANESE
RS Pulling System: R.S.pulling System With The Plastic Film Conveyer: For Long Sheet Foam 50m Conveyer
After-sales Service Provided: Engineers Available To Service Machinery Overseas Foam Block Cutter: Synchronous Cutting During The Foaming
Foaming Material: PPG/POP/TDI/MC/SI Machine Specification:: Standard 13groups Can Be Changed
Machine Spare Parts: Some Necessary Parts Together With The Machine
High Light:

Mattress Pu Foam Manufacturing Machines

,

Automatic Pu Foam Manufacturing Machines

,

Horizontal Polyurethane Foaming Machine

 
Automatic Horizontal Flexible Foam Production Machine Line For Mattress / Pillow
 
The ZHF-2017 Horizontal Continuously foam production line is an automatic continous foaming machine for producing flexible polyurethane foam used in furniture,shoe material,packing,electron,garment and transportation industrial.it's the ideal production equipment for large-scale foaming.
 

We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.
 
A polyurethane foam is obtained by mixing and foaming a polyol component and an isocyanate component under stirring, wherein water is used as a foaming agent in the polyol component, and water-containing thermoplastic resin synthetic pellets. The molded polyurethane foam comprises thermoplastic synthetic resin porous particles having interconnected pores formed by evaporation of an isocyanate component and water-based thermoplastic synthetic resin particles.
Main specification

 Foaming controlling Platform (standard)L3m×W2.52m×H0.7m
 Oven declining board (standard)L6.8m×W0.98m~2.4m
 Oven side links (standard)L18m×W2.4m×H1.2m
 Oven machine frame (standard)L18m ×W4m×H3m
 total powerL18m×W2.4m×H0.83m
 Oven inner conveyer line (standard)18m
 Foam block cutter machine (standard)W2.4m×H1.30m (knife belt with cross type)
 conveyer belt speed0-8m/min
 fall plateseven section adjustable
  R.S Pulling system one set
 machine dimensionL35× W4.2 ×H3.2m
 

Main technique specification:
 

DimensionTotal length 35m×Total width 4m×Total Height 3m
Foaming material Group13 groups, man-machine interface, both manual and automatically computer control
Foaming width980mm~2250mm
Foaming heightMax 1200mm
Foaming density8Kg/m³~100kg/m³
Foaming speed2000r/min~7000r/min
Max total output300kg/min
Material spraying way① The way of down sprayer head (upper, down, front, back can be adjusted)             ② the way of trough overflow pipe.
Controlling way of foaming

①PLC controlling, can continuously foaming two different formulas in one time
②All inverter controlling foaming and work in phase with the production line
③Oven declining board height and width can be adjusted by control box.
④Oven side links width can be adjusted by control box

Mixing –head motor

37kw

Total power

About 90kw
 

FAQ:

 
Q: How many days for the install and testing of the machine?
 
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
 
Q: For the cost of the engineer how much I need to pay?
 
A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
 
Q:During the foaming if we have some problems abt the foam and the machine how can we do ?
 
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
 
The main part of the machine
Automatic Horizontal Pu Foam Manufacturing Machines For Mattress Pillow 0
 
Automatic Horizontal Pu Foam Manufacturing Machines For Mattress Pillow 1
 
Automatic Horizontal Pu Foam Manufacturing Machines For Mattress Pillow 2
 
Specification for 13groups of Horizontal foaming m...

Contact Details
Dongguan Zehui machinery equipment co., ltd

Contact Person: Wang

Tel: 0086-15817646348

Send your inquiry directly to us (0 / 3000)

Other Products