Product Details:
|
| Highlight: | turnkey foam plant,sponge foam production setup,foam plant machinery |
||
|---|---|---|---|
Starting a foam plant involves more than buying one machine, so this turnkey sponge foam plant package is assembled as a complete production setup around a 200 cubic metre daily output target. The package includes the continuous foaming machine, the dosing and metering skid, the curing area layout, a vertical cutting machine, a horizontal cutting machine and the material handling equipment that moves blocks between stations. Engineering support covers the workshop layout drawing, the power and water schedule, the compressed air requirement and the exhaust ventilation plan, so the customer can brief a local contractor with a complete document set instead of guessing at capacities. The line is balanced so that the cutting equipment can absorb the full foaming output without creating a bottleneck, which is the most common mistake in a new plant. Installation supervision, operator training and a start up production plan are part of the delivery scope. The result is a plant that reaches rated output in weeks rather than the months typically needed when equipment is bought piece by piece from different suppliers.
Key Features| Parameter | Specification |
|---|---|
| Rated daily output | 200 cubic meter of blocks |
| Foaming machine | continuous tunnel type included |
| Dosing skid | 8 metering groups included |
| Vertical cutter | included |
| Horizontal cutter | included |
| Block handling | roller conveyor and turntable |
| Workshop area required | about 1200 square meter |
| Installed power | about 220 kW total |
| Delivery scope | layout, installation, training |
This package is aimed at new investors entering the foam business, at furniture groups that want to control their own foam supply, and at regional distributors adding local production. It also fits existing plants that relocate to a new site and prefer to buy a balanced line instead of moving worn equipment. Because the layout reserves space for expansion, the plant can add a second foaming line, a CNC contour cutter or a rebonding section later without rebuilding the building layout.
Packaging & Quality AssuranceEquipment is shipped in multiple containers with each machine braced on a steel skid and protected by film and plywood. A packing list maps every case to the layout drawing, which simplifies unloading and site storage. The warranty is twelve months on machines and controls with a separate structural warranty on frames. Commissioning covers mechanical installation supervision, electrical checks, pour trials and operator training, and the project team remains available for weekly review calls during the first month of production.
Contact Person: Wang
Tel: 0086-15817646348
Fax: 86-0769-88875397