Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China | zhmach@zehuimach.com |
Place of Origin: | Guangdong, China (Mainland) |
Brand Name: | ZHMACH |
Certification: | CE |
Model Number: | ZHF-2017 |
Minimum Order Quantity: | one set |
---|---|
Price: | inquiry |
Packaging Details: | foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ |
Delivery Time: | 45days after receive downpayment |
Payment Terms: | Western Union, L/C, T/T |
Supply Ability: | two sets per month |
Product Type: | Automatic Continously Foam Making Machine | Weight: | 25tons |
---|---|---|---|
Voltage: | 380V | Machine Pump: | U.S VIKING PUMP/ JAPANESE |
Foam Type: | Overflow Box And Spray Head | RS Pulling System: | R.S.pulling System With The Plastic Film |
Fall Plate: | 7 Section Automatic Adjustale | Foaming Speed: | 2000r/min-7000r/min |
Conveyer: | For Long Sheet Foam 50m Conveyer | Foaming Way: | Spray Head And Overflow Box |
Block Cutter: | Blade & Saw Tooth Double Knife Type/ Blade Type/Saw Tooth Type | ||
Highlight: | polyurethane foaming machine,polyurethane foam equipment,full auto polyurethane foaming machine |
Full-automatic Continuouse Polyurethane Foaming Machine for Sofa and Shoes
The ZHF-2017 Horizontal Continuously foam production line is an automatic continous foaming machine for producing flexible polyurethane foam used in furniture,shoe material,packing,electron,garment and transportation industrial.it's the ideal production equipment for large-scale foaming.
We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.
Main specification
Oven Length | 18m |
Foam Height | 1.0-1.25m |
Foam Width | 1.0-2.25m |
foam desity | 8-200kg/m³ |
total power | 130KW |
inner coveyer length | 18m |
side board adjustable width | 0.98-2.3m |
conveyer belt speed | 0-8m/min |
fall plate | seven section adjustable |
total output | 100-300kg/min |
machine dimension | L35× W4.2 ×H3.2m |
Main technique specification:
Dimension | Total length 35m×Total width 4m×Total Height 3m |
Foaming material Group | 13 groups, man-machine interface, both manual and automatically computer control |
Foaming width | 980mm~2250mm |
Foaming height | Max 1200mm |
Foaming density | 8Kg/m³~100kg/m³ |
Foaming speed | 2000r/min~7000r/min |
Max total output | 300kg/min |
Material spraying way | ① The way of down sprayer head (upper, down, front, back can be adjusted) ② the way of trough overflow pipe. |
Controlling way of foaming |
①PLC controlling, can continuously foaming two different formulas in one time ②All inverter controlling foaming and work in phase with the production line ③Oven declining board height and width can be adjusted by control box. ④Oven side links width can be adjusted by control box |
Mixing –head motor |
37kw |
Total power |
About 90kw |
Transducer Types
Model | Power/kw | Use | Qty | Brand |
G120 | 37 | Mixing head | 1 | Siemens |
G120 | 7.5 | POP, CaCo3 | 2 | Siemens |
G120 | 5.5 | PPG, | 1 | Siemens |
G120 | 4 | TDI, Flame retardant | 2 | Siemens |
G120 | 2.2 | MC, color | 2 | Siemens |
G120 | 1.5 | Water, Ann, Si, Tin, Color Anti-yellow etc | 7 | Siemens |
G120 | 0.75 | Spray head | 1 | Siemens |
VFD-B | 5.5/3.7/1.5 | Oven inner conveyer line,side conveyer line, cutting machine | 3 | Delta |
FAQ:
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do ?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
The main part of the machine
Contact Person: Wang
Tel: 0086-15817646348
Fax: 86-0769-88875397
130KW PE Foam Net Making Machine , EPE Bags Foam Manufacturing Equipment
EPE Foam Making Machine , Low Pressure Polyurethane Foam Machine With Siemens Invertor
Full Automatic Mattress Manufacturing Machines , Industrial Foam Machine For Sofa / Shoes
High Speed Vertical Foam Making Machine With Electronic Frequency Converter Control
Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter
Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture
Vertical Foam Mattress Making Machine Manual Operation With Speed 30~40 R/Min
Auto Sponge Circle Horizontal Foam Cutting Machine / CNC Foam Cutter Machine
Industrial Vertical Foam Cutter For Sponge Mattress , Cnc Eps Cutting Machine
Rail Type Foam Block Foam Sheet Cutting Machine Horizontal PLC Control
Hydraulic Polyurethane Foam Cutting Machine For Sponge Sheet Automatic Control