logo
Send Message
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Home ProductsPolyurethane Foam Machine

PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow

PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow

  • PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow
  • PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow
PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow
Product Details:
Place of Origin: Guangdong, China (Mainland)
Brand Name: ZHMACH
Certification: CE
Model Number: ZHF-2017
Payment & Shipping Terms:
Minimum Order Quantity: one set
Price: inquiry
Packaging Details: foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ
Delivery Time: 45days after receive downpayment
Payment Terms: Western Union, L/C, T/T
Supply Ability: two sets per month
Contact Now
Detailed Product Description
Chiller: 10hp-30hp Temperature System Invertor: Siemens/ Delta/Danfoss
Machine Pump: U.S VIKING PUMP/ JAPANESE Foam Type: Overflow Box And Spray Head
RS Pulling System: R.S.pulling System With The Plastic Film Conveyer: For Long Sheet Foam 50m Conveyer
Foaming Way: Spray Head And Overflow Box Block Cutter: Blade & Saw Tooth Knife Type
Certification: CE
Highlight:

polyurethane foam equipment

,

continuous foaming machine

,

plc control foam making machine

 

PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow

 

 

PU sponge foam Continuous Foam Machines is the horizontal foam making machine that make long foam continuously then with one block cutter cut into foam block for make the foam for mattress and sofa.
 
The machine is automatic PLC control and can save more than 200 sets of foaming formulations in the computer.
It adopt the advance technology from UK with import spare

 

Main technique parameters and equipments
 
(1)The whole machine parts specifications:
 
1, Foaming controlling Platform (standard)           L3m×W2.52m×H0.7m
2, Oven declining board (standard)              L6.8m×W0.98m~2.3m
3, Oven side links (standard)           L18m×W2.3m×H1.2m
4, Oven machine frame (standard)           L18m ×W4m×H3m
5, Oven inner conveyer line (standard)            L18m×W2.3m×H0.83m
6, Foam block cutter machine (standard)           W2.3m×H1.30m(knife belt with cross type )
7, R.S. Pulling system with plastic             one set

 

Main technique specification:
 

Oven Length 18m Inner Conveyer length 18m
Foaming Height 1.0-1.25m Side Borar Adjustable Width 0.98-2.3m
Foaming Width 1.0-2.25m Conveyer Belt Speed 0-8m/min
Foaming Density 8-100kg/m3 Fall Plate Six section adjustable
Total Power 130KW Total output 100-300kg/min
 

 

Dimension Total length 35m×Total width 4m×Total Height 3m
Foaming material Group 13 groups, man-machine interface, both manual and automatically computer control
Foaming width 980mm~2250mm
Foaming height Max 1200mm
Foaming density 8Kg/m³~100kg/m³
Foaming speed 2000r/min~7000r/min
Max total output 300kg/min
Material spraying way ① The way of down sprayer head (upper, down, front, back can be adjusted)       ② the way of trough overflow pipe.
Controlling way of foaming

①PLC controlling, can continuously foaming two different formulas in one time
②All inverter controlling foaming and work in phase with the production line
③Oven declining board height and width can be adjusted by control box.
④Oven side links width can be adjusted by control box

Mixing –head motor

37kw

Total power

About 90kw

Pneumatic, flow meter equipments types
 
Model Pass Caliber Use Qty Brand
K-301L/75DA cross valve G2″ POP, PPG,CaCO3,Foam 3 Korea
K-301L/63DA p cross valve G1″ TDI foam 1 Korea
K-301L/32DA cross valve G½″ Other small material, Flame retardant, Anti-yellow 9 Korea
DK800 glass flow meter 20-200 L/h AIR 1 China
FA10-15 glass flow meter 40~400L/H H2O 1

 
China

FA10-25F glass flow meter 150~1500L/H MC 1

 
China

FA10-25F glass flow meter 600~6000L/H TDI 1  
Transducer speed adjusted head Φ25*2000mm foam 1 Zehui

 
FAQ:

 
Q: How many days for the install and testing of the machine?
 
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
 
Q: For the cost of the engineer how much I need to pay?
 
A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
 
Q:What kind of raw material tools we need to prepare for the testing?
 
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
 
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
 
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
 
Q:During the foaming if we have some problems abt the foam and the machine how can we do ?
 
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

The main part of the machine
 
PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow 0
 
PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow 1

 

INSTRUCTION OF CONTINUOUS FAOMING MACHINE LINE.pdf...

Contact Details
Dongguan Zehui machinery equipment co., ltd

Contact Person: Wang

Tel: 0086-15817646348

Fax: 86-0769-88875397

Send your inquiry directly to us (0 / 3000)

Other Products