Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Home ProductsPolyurethane Foam Machine

High Density Hard Rigid PU Foam Making Machine , Polyurethane Foam Injection Machine

High Density Hard Rigid PU Foam Making Machine , Polyurethane Foam Injection Machine

  • High Density Hard Rigid PU Foam Making Machine , Polyurethane Foam Injection Machine
  • High Density Hard Rigid PU Foam Making Machine , Polyurethane Foam Injection Machine
High Density Hard Rigid PU Foam Making Machine , Polyurethane Foam Injection Machine
Product Details:
Place of Origin: Guangdong, China (Mainland)
Brand Name: ZHMACH
Certification: CE
Model Number: ZHF-2017
Payment & Shipping Terms:
Minimum Order Quantity: one set
Price: inquiry
Packaging Details: foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ
Delivery Time: 45days after receive downpayment
Payment Terms: Western Union, L/C, T/T
Supply Ability: two sets per month
Contact Now
Detailed Product Description
Product Type: Automatic Continously Foam Making Machine Dimension(L*W*H): L35m*W4m*H3m
Voltage: 3PAHSE 380V Machine Pump: U.S. VIKING /CHN Shanghai Hangfa/JAN SHIMADZU
Flow Meter: Glass Flow Meter RS Pulling System: R.S.pulling System With The Plastic Film
Raw Material: Polyurethane Machine Control Way: Automatic PLC And Invertor Control
Block Cutter: Blade & Saw Tooth Double Knife Type Feature: High Efficiency
High Light:

polyurethane foaming machine

,

continuous foaming machine

,

polyurethane foam making machines

 

High Density Hard Rigid Pu Foam Making Machine , Polyurethane Foam Injection Machine

 

Product Description

 

Full-automatic Continuouse Polyurethane Foam Making Machine is the automatic horizontal continously foaming machine that make the furniture foam like sofa and mattress. The standard machine was together with 13 kinds of raw material.

 

For the process of foaming:

 

Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process

 

Main specification

 

Max.Output Capacity 200~350kg/min(Continuous Type)
Mixer Total Power 37kw
Max.Mixing Speed 2500~6000r/min
Foaming Type Trough & Sprayer
Standard Material Q.T.Y. 13 Groups.
Foaming Size W2300mm*H1300mm(Width Adjustable)
Control System PLC Digital Touch Screen
PPG Tank 5Ton*1Set.
POP Tank 5Ton*1Set.
TDI Tank 5Ton*1Set.
MC Tank 2Ton*1Set.
Caco3 Tanks 5Ton*1Set
T-9/Amine/Color 1ABCD/ Silicone /Water Tanks 180L*8Sets
Side Wall Size L16m*H1200mm
Fall plate L8.5m*W0.98~2.4m(Adjustable)
Foaming Platform L2000mm*W3000mm*H700mm
Conveyor Line L16.9m
Side/Bottom Paper Feed & Rewind System 2Sets.
Walkway W500mm*L15m
Air Valves U.S. Standard
Chiller(Both Cooling & Heating System) 1Set*1.5HP
R.S.Pulling System 1Set.
Foaming Density Range 8~150kg/Cubicmeter.
Match With Block Cutter 1Set.
Total Motor Power Approx 125kw.
Machine N.W. Approx 30 Ton
Floor Space Required L45m*W5m*H4.5m.

 

FAQ:

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

The main part of the machine

 

High Density Hard Rigid PU Foam Making Machine , Polyurethane Foam Injection Machine 0

 

High Density Hard Rigid PU Foam Making Machine , Polyurethane Foam Injection Machine 1

 

Specification for 13groups of Horizontal foaming m...

Contact Details
Dongguan Zehui machinery equipment co., ltd

Contact Person: Wang

Tel: 0086-15817646348

Send your inquiry directly to us (0 / 3000)

Other Products