Send Message
Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Home ProductsFoam Production Line

Continuous Foaming Flexible Foam Production Line Horizontal For Mattress / Pillow

Continuous Foaming Flexible Foam Production Line Horizontal For Mattress / Pillow

Continuous Foaming Flexible Foam Production Line Horizontal For Mattress / Pillow
video
Continuous Foaming Flexible Foam Production Line Horizontal For Mattress / Pillow
Product Details:
Place of Origin: Guangdong, China (Mainland)
Brand Name: ZHMACH
Certification: CE
Model Number: ZHF-2017
Payment & Shipping Terms:
Minimum Order Quantity: one set
Price: inquiry
Packaging Details: foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ
Delivery Time: 45days after receive downpayment
Payment Terms: Western Union, L/C, T/T
Supply Ability: two sets per month
Contact Now
Detailed Product Description
Product Type: Automatic Continously Foam Making Machine Control Mode: Automatic PLC Control
Voltage: 380V/50HZ Or Customized Invertor: Siemens/ Delta/Danfoss
Machine Pump: U.S VIKING PUMP/ JAPANESE Foam Block Cutter: Synchronous Cutting During The Foaming
R.S.system: R.S.pulling System With The Plastic Film Fall Plate: 7 Section Automatic Adjustale
Foam Formulation: Automatic Save More Than 200 Sets Total Output: 100-300kg/min
High Light:

foam manufacturing equipment

,

pvc foam board production line

,

Synchronous Cutting Foam Production Line

 
Polystyrene Horizontal Flexible Foam Production Line for Mattress and Pillow
 
Specification
The Foam making machine is a automatic continuous foaming machine for producing flexible polyurethane foam used in furniture, shoe material, packing, electron, garment and transportation industrial. It’s the ideal production equipment for large-scale foaming. 

 
 
Main specification
 

 Oven Length18m
 Foam Height1.0-1.25m
 Foam Width1.0-2.25m
 foam desity8-200kg/m³
 total power130KW
 inner coveyer length18m
 side board adjustable width0.98-2.3m
 conveyer belt speed0-8m/min
 fall plateseven section adjustable
 total output100-300kg/min
 machine dimensionL35× W4.2 ×H3.2m
 
 

Main technique specification:
 

Dimension

Total length 35m×Total width 4m×Total Height 3m
 

Foaming material Group13 groups, man-machine interface, both manual and automatically computer control
Foaming width

980mm~2250mm
 

Foaming height

Max 1200mm
 

Foaming density

8Kg/m³~100kg/m³
 

Foaming speed

2000r/min~7000r/min
 

Max total output

300kg/min
 

Material spraying way① The way of down sprayer head (upper, down, front, back can be adjusted)             ② the way of trough overflow pipe.
Controlling way of foaming

①PLC controlling, can continuously foaming two different formulas in one time
②All inverter controlling foaming and work in phase with the production line
③Oven declining board height and width can be adjusted by control box.
④Oven side links width can be adjusted by control box
 

Mixing –head motor

37kw
 

Total power

About 90kw
 

 
 

How is the packing of the machine?
 
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
 
How many container will be needed for the whole set of machine?
 
For the standard 13 groups of Automatic continous foam machine Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.
We will try the best way to pack all the machine well and also save the freight cost.

 
 
FAQ:

 
Q: How many days for the install and testing of the machine?
 
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
 
Q: For the cost of the engineer how much I need to pay?
 
A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
 
Q:What kind of raw material tools we need to prepare for the testing?
 
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
 
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
 
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
 
Q:During the foaming if we have some problems abt the foam and the machine how can we do ?
 
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
 
Q: During the using of the products if we find some problem how can we slove?
 
A: You can just help to check in the operation manual and the video first if can’t work just call our after sale service.
 
Q: How many spare parts for you to give us?
 
A: We will send you all the necessary spare parts that free of charge together with the machine. After that you need to buy.
 
 
 
Continuous Foaming Flexible Foam Production Line Horizontal For Mattress / Pillow 0
 
 
 
Continuous Foaming Flexible Foam Production Line Horizontal For Mattress / Pillow 1

Contact Details
Dongguan Zehui machinery equipment co., ltd

Contact Person: Wang

Tel: 0086-15817646348

Fax: 86-0769-88875397

Send your inquiry directly to us (0 / 3000)

Other Products