Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China | zhmach@zehuimach.com |
Place of Origin: | Guangdong, China (Mainland) |
Brand Name: | ZHMACH |
Certification: | CE Certificate |
Model Number: | ZHQG-1200/1500 |
Minimum Order Quantity: | one set |
---|---|
Price: | inquiry |
Packaging Details: | It will be packed in wooden case |
Delivery Time: | 30 days |
Payment Terms: | L/C, T/T, T/T, Western Union |
Supply Ability: | two sets per month |
Type: | Manual | Saw Blade Diameter: | 0.32 |
---|---|---|---|
Voltage: | 380V 3PHASE | After-sales Service Provided: | Engineers Available To Service Machinery Overseas |
Max Cutting Width: | W1200*L1200mm | Cutting Density(max): | 80kg/m3 |
Scope Of Application: | W1200-W2000 | Dimensions: | L2270*W2550*H1500mm |
Max. Cutting Depth: | H600mm | Machine Weight: | 2000kg/2200kg |
Highlight: | foam block cutting machine,foam contour cutting machine |
Manual Modeling Vertical PU Foam Contour Machine for Special- shaped Pillow Sponge 4.2 kw
This machine is mainly used for the cutting work of special-shaped slicing foam,it uses pre-production molds of different shapes to process cylinder,arc,pillows and other special shaped products.it is equipped with fans in order to fix foam for better effect which ensures product quality and reduces waste.
Features:
The machien adopts head moving,table fixed form,movable cutting tool rest with synchronous belt drive,work platform single damper using ball screw(can shoose doble baffle),improving the cutting precision.At the same time for processing all kinds of EVA and pearl cotton.The machine adopts frequency control of moter speed automatical control,the control platform with PLC and human-computer interface,with a high degree of automation,cutting precision,safe operation etc.
Model | ZHQG-1200 |
ZHQG1500 |
Max Cutting width | W1200*L1200mm |
W1200*L1500 mm |
Max Cutting height | H 600 mm |
H 600 mm |
Total power |
3.8 Kw |
4.2 Kw |
Blade length |
6200 mm |
6900 mm |
Machine weight |
600kg |
800kg |
Machine external size |
L2270*W2550*H1500mm |
L3000*W2850*H1500 mm |
Marks: |
|||||
1. According to seller's standard designed drawing diagrame to arrange the production and inspection. |
|||||
2. if customer reqiure, techincians will be sent by seller, and the turn-round tickets fee, vise fee, $40 per day of allowance fee and hotel accommodation are in charge of buyer. |
|||||
3. Payments Terms: T/T 30% advance before production.the balance of total amount 70% will be paid before shippment (The bank charge for buyer's account). |
|||||
4. Delivery forms: Send to ShenZhen Seaport |
|||||
5. Spare parts: Offer assorted maintain tools. |
|||||
6. Package: paper & film package. |
|||||
7. Voltage: all the eqiupments are: 380V, 50HZ, 3P.(Voltage can be changed, but price need to increase 3%) |
|||||
8. Delivery date: 30 days (after seller get the advance). |
|||||
9. All the machines maintain for one year, if the damages caused by machine itself, excluding the man-made accidents, the broken parts offered by seller in free of charge, but the transport cost for buyer's account. |
We will offer the operation manul with the video for the install, operate and maintain of this machine.
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems about the foam and the machine how can we do ?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
Q: During the using of the products if we find some problem how can we slove?
A: You can just help to check in the operation manual and the video first if can’t work just call our after sale service.
Q: How many spare parts for you to give us?
A: We will send you all the necessary spare parts that free of charge together with the machine. After that you need to buy.
Contact Person: Wang
Tel: 0086-15817646348
Fax: 86-0769-88875397
130KW PE Foam Net Making Machine , EPE Bags Foam Manufacturing Equipment
EPE Foam Making Machine , Low Pressure Polyurethane Foam Machine With Siemens Invertor
Full Automatic Mattress Manufacturing Machines , Industrial Foam Machine For Sofa / Shoes
High Speed Vertical Foam Making Machine With Electronic Frequency Converter Control
Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter
Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture
Vertical Foam Mattress Making Machine Manual Operation With Speed 30~40 R/Min
Auto Sponge Circle Horizontal Foam Cutting Machine / CNC Foam Cutter Machine
Industrial Vertical Foam Cutter For Sponge Mattress , Cnc Eps Cutting Machine
Rail Type Foam Block Foam Sheet Cutting Machine Horizontal PLC Control
Hydraulic Polyurethane Foam Cutting Machine For Sponge Sheet Automatic Control