Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China | zhmach@zehuimach.com |
Place of Origin: | Guangdong China (Mainland) |
Brand Name: | ZHMACH |
Certification: | CE Certificate |
Model Number: | ZHF-2017-7 |
Minimum Order Quantity: | one set |
---|---|
Price: | inquiry |
Packaging Details: | Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ. |
Delivery Time: | 45 days |
Payment Terms: | Western Union, T/T, L/C |
Supply Ability: | two sets per month |
Weight: | 20 Tons | Dimension(L*W*H): | L5430xW4650xH2590mm |
---|---|---|---|
After-sales Service Provided: | Engineers Available To Service Machinery Overseas | Power(W): | 43kw |
Foaming Model: | Semi-automatic | Formular: | Auto Save The Formulations |
Warranty: | One Year | Inverter: | Siemens/ Delta /Danfoss |
Chemical: | PPG, TDI, MC, Silicone+H2O, T9, A33, Etc. | Pumps: | US. Viking/ Chinese/ Japanese |
Highlight: | foam mattress making machine,pu foam making machine,Sofa Polyurethane Foaming Machine |
Semi - Auto Low Pressure Polyurethane Foaming Machine For Foaming Mattress and Sofa
ZHF-2017-7 Semi-Auto Foam Making Machine
Main technique specification:
1, Dimension:L2.8 m×W1.5m×H2.5m
2, Foam mould size(can be adjusted): W1500-2000×L2000-3000×H1200 two sets
3, Foaming material Group: 7 groups, man-machine interface control
4, Foaming height: Max 1200mm
5, Foaming density: 8Kg/m³~100kg/m³
6, Foaming speed: 2000r/min~7000r/min
7, Max total output:230L/time
8, Mixing –head motor: 11kw
9, Total power: About 43 kw
Main collocates and material chooses:
Material pot types: (The work pressure in the pot is normal pressure)
Type | Use |
Specification |
Qty |
Big material tank | PPG+mixture material | 3m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | TDI | 2m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system |
1 |
Big material tank | MC |
1m³/δ2mm stainless steel |
1 |
Small material tank | Si,T9,A33,Color | 80L/δ1mm stainless steel | 4 |
Transducer Types
Model | Power/kw |
Use |
Qty | Brand |
VFD-B | 11 |
Mixing head |
1 | Delta |
VFD-B | 5.5 |
PPG |
1 | Delta |
VFD-B | 3.7 |
TDI |
1 | Delta |
VFD-B | 2.2 |
MC |
1 | Delta |
VFD-B | 1.5 | Si,T9,A33,Color |
4 |
Delta |
Motor types:
Model | Power/kw |
Use |
Qty | Brand |
Y200L-2 | 11 |
Mixing head |
1 | Guangdong |
Y132S-4 Horizontal | 7.5 |
PPG |
1 | Guangdong |
Y132S-4 Horizontal | 3.7 |
TDI |
1 | Guangdong |
Y100-4 Horizontal | 2.2 |
MC |
1 | Guangdong |
Y100-6 Horizontal | 1.5 |
Ann, Si, Tin, Color, |
4 | Guangdong |
Y100-4 Vertical | 2.2 |
PPG material mixing |
1 | Guangdong |
Y100-4 Vertical | 1.5 |
TDI Mixing |
1 | Guangdong |
Y100-4 Horizontal | 2.2 |
PPG mixing |
1 | Guangdong |
Y100-4 Horizontal | 2.2 |
TDI filing |
1 | Guangdong |
Our Services
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
Contact Person: Mr. Wang
Tel: 0086-15817646348
Fax: 86-0769-88875397
130KW PE Foam Net Making Machine , EPE Bags Foam Manufacturing Equipment
EPE Foam Making Machine , Low Pressure Polyurethane Foam Machine With Siemens Invertor
Full Automatic Mattress Manufacturing Machines , Industrial Foam Machine For Sofa / Shoes
High Speed Vertical Foam Making Machine With Electronic Frequency Converter Control
Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter
Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture
Vertical Foam Mattress Making Machine Manual Operation With Speed 30~40 R/Min
Auto Sponge Circle Horizontal Foam Cutting Machine / CNC Foam Cutter Machine
Industrial Vertical Foam Cutter For Sponge Mattress , Cnc Eps Cutting Machine
Rail Type Foam Block Foam Sheet Cutting Machine Horizontal PLC Control
Hydraulic Polyurethane Foam Cutting Machine For Sponge Sheet Automatic Control